B&K B&K Group Brad Coleman

B&K Plastics · Shop floor

Production — live

Every injection-moulding machine and the Stile Edge profiling line in real time — what's loaded, who's running it, cycle time and OEE.

Machines running

1/2

live now

Avg OEE (running)

94%

2 pts vs yest.

In setup

1

changeover

Down / maintenance

0

needs action

Engel Victory 200T

B&K Plastics
Running
Current job
JOB-2026-0420
Rebar Spacer Wheel 40mm
Mould loaded
MT-230
Cycle
22s
Operator
Dragan Petrov
OEE94%

Toshiba EC350 — 350T

B&K Plastics
Setup
Current job
JOB-2026-0423
Diagnostic Housing Shell
Mould loaded
MT-219
Cycle
Operator
Wayne Trevorrow
OEE72%