BK
BC

Brad Coleman

Group Owner · Executive

Layout

Settings
Xero connectedLast sync 2026-06-24 09:14 AEST
BK B&K Plastics BC

B&K Plastics · Shop floor

Production — live

Every injection-moulding machine and the Stile Edge profiling line in real time — what's loaded, who's running it, cycle time, output against target and OEE.

Machines running

1/2

live now

Avg OEE (running)

94%

2 pts vs yest.

Output vs target

5,240

of 9,800 planned

Scrap rate

0.7%

38 rejects

Engel Victory 200T

B&K Plastics
Running
Current job
JOB-2026-0420
Rebar Spacer Wheel 40mm
Mould loaded
MT-230
Cycle
22s
Operator
Moulding Operator 3
Shift output5,240 / 9,000
OEE 94%
Availability97%
Performance99%
Quality98%

Next up: JOB-2026-0426

Toshiba EC350 — 350T

B&K Plastics
Setup
Current job
JOB-2026-0423
Diagnostic Housing Shell
Mould loaded
MT-219
Cycle
Operator
Moulding Supervisor
OEE 72%
Availability78%
Performance95%
Quality97%

Downtime log

0.9 hrs lost · last 3 shifts
MachineReasonCategoryMins
IMM-04Toshiba EC350 — 350T Tool change MT-219 → diagnostic housing run Changeover 45
IMM-03Engel Victory 200T Flash on rebar spacer — clamp tonnage adjusted Quality 12

Lost time by cause

  • Changeover0.8h
  • Quality0.2h