B&K
BC

Brad Coleman

Group Owner · Executive

Layout

Settings
Xero connectedLast sync 2026-06-24 09:14 AEST
B&K B&K Group BC

All businesses · Shop floor

Production — live

Every injection-moulding machine and the Stile Edge profiling line in real time — what's loaded, who's running it, cycle time, output against target and OEE.

Machines running

4/7

live now

Avg OEE (running)

90%

2 pts vs yest.

Output vs target

6,474

of 11,800 planned

Scrap rate

0.9%

56 rejects

Haitian MA1600 — 160T

Mining Parts Australia
Running
Current job
JOB-2026-0418
Modular Screen Panel 305×305 — 8mm
Mould loaded
MT-140
Cycle
48s
Operator
Moulding Operator 1
Shift output312 / 540
OEE 87%
Availability92%
Performance96%
Quality98%

Next up: JOB-2026-0424

Haitian MA900 — 90T

Mining Parts Australia
Running
Current job
JOB-2026-0421
Pulley Lagging Tile 100×100
Mould loaded
MT-171
Cycle
31s
Operator
Moulding Operator 2
Shift output884 / 1,400
OEE 91%
Availability95%
Performance98%
Quality98%

Engel Victory 200T

B&K Plastics
Running
Current job
JOB-2026-0420
Rebar Spacer Wheel 40mm
Mould loaded
MT-230
Cycle
22s
Operator
Moulding Operator 3
Shift output5,240 / 9,000
OEE 94%
Availability97%
Performance99%
Quality98%

Next up: JOB-2026-0426

Toshiba EC350 — 350T

B&K Plastics
Setup
Current job
JOB-2026-0423
Diagnostic Housing Shell
Mould loaded
MT-219
Cycle
Operator
Moulding Supervisor
OEE 72%
Availability78%
Performance95%
Quality97%

Negri Bossi 120T

Hydrant Australia
Idle
Current job
Mould loaded
Cycle
Operator
OEE 0%
Availability0%
Performance0%
Quality0%

Next up: JOB-2026-0422

Battenfeld HM450 — 450T

Mining Parts Australia
Maintenance
Current job
Mould loaded
MT-160
Cycle
Operator
OEE 0%
Availability0%
Performance0%
Quality0%

Stile Edge Profiling Line A

Stile Edge
Running
Current job
JOB-2026-0419
Pool coping bullnose — porcelain, 180 lm
Mould loaded
Cycle
Operator
Lead Profiler
Shift output38 / 60
OEE 88%
Availability93%
Performance97%
Quality97%

Next up: JOB-2026-0425

Downtime log

16.5 hrs lost · last 3 shifts
MachineReasonCategoryMins
IMM-06Battenfeld HM450 — 450T Hydraulic pump seal failure — awaiting parts (450T) Breakdown 480
IMM-04Toshiba EC350 — 350T Tool change MT-219 → diagnostic housing run Changeover 45
IMM-01Haitian MA1600 — 160T Short shots after resin lot change — purged + reset profile Quality 18
IMM-05Negri Bossi 120T Hydrant line unstaffed this shift — marker-post run not started No operator 300
IMM-02Haitian MA900 — 90T UHMWPE hopper ran low — refilled from RES-104 Material 22
IMM-03Engel Victory 200T Flash on rebar spacer — clamp tonnage adjusted Quality 12
EDG-01Stile Edge Profiling Line A Profile wheel swap — bullnose → stair nosing Changeover 25
IMM-06Battenfeld HM450 — 450T Scheduled greasing + tie-bar inspection Planned maintenance 90

Lost time by cause

  • Breakdown8.0h
  • No operator5.0h
  • Planned maintenance1.5h
  • Changeover1.2h
  • Quality0.5h
  • Material0.4h