MPA
M1

Moulding Operator 1

Module Operator · Operational

Layout

Xero connectedLast sync 2026-06-24 09:14 AEST
MPA Mining Parts Australia M1

Mining Parts Australia · Shop floor

Production — live

Every injection-moulding machine and the Stile Edge profiling line in real time — what's loaded, who's running it, cycle time, output against target and OEE.

Machines running

2/3

live now

Avg OEE (running)

89%

2 pts vs yest.

Output vs target

1,196

of 1,940 planned

Scrap rate

1.4%

17 rejects

Haitian MA1600 — 160T

Mining Parts Australia
Running
Current job
JOB-2026-0418
Modular Screen Panel 305×305 — 8mm
Mould loaded
MT-140
Cycle
48s
Operator
Moulding Operator 1
Shift output312 / 540
OEE 87%
Availability92%
Performance96%
Quality98%

Next up: JOB-2026-0424

Haitian MA900 — 90T

Mining Parts Australia
Running
Current job
JOB-2026-0421
Pulley Lagging Tile 100×100
Mould loaded
MT-171
Cycle
31s
Operator
Moulding Operator 2
Shift output884 / 1,400
OEE 91%
Availability95%
Performance98%
Quality98%

Battenfeld HM450 — 450T

Mining Parts Australia
Maintenance
Current job
Mould loaded
MT-160
Cycle
Operator
OEE 0%
Availability0%
Performance0%
Quality0%

Downtime log

10.2 hrs lost · last 3 shifts
MachineReasonCategoryMins
IMM-06Battenfeld HM450 — 450T Hydraulic pump seal failure — awaiting parts (450T) Breakdown 480
IMM-01Haitian MA1600 — 160T Short shots after resin lot change — purged + reset profile Quality 18
IMM-02Haitian MA900 — 90T UHMWPE hopper ran low — refilled from RES-104 Material 22
IMM-06Battenfeld HM450 — 450T Scheduled greasing + tie-bar inspection Planned maintenance 90

Lost time by cause

  • Breakdown8.0h
  • Planned maintenance1.5h
  • Material0.4h
  • Quality0.3h